CITY OF PORT COQUITLAM FLOOD PROTECTION WORKS INTERNAL DRAINAGE STUDY ESTIMATED MANPOWER REQUIREMENTS & COSTS HYDROLOGY Calculation of instantaneous flows for 5, 10 and 25 year return periods - 1 Engineer week (Sr) HYDRAULIC DESIGN Design of ditches, flood boxes and pump stations Each area ~ 1 Engineer week *— ; - : Total ~ 3 Engineer vieeks (int) COST ESTIMATES Quantities and cost estimates Each area - 1.5 Engineer weeks a Total ‘- 4.5 Engineer weeks (Int) DRAWINGS AND REPORT - ' Assume 4 drawings for each area @ 1 Draftsman week Total - 12 Draftsman weeks (Int) - ; ; Supervision of drawings, compilation and drafting of report - 5 Engineer weeks (Int) DISBURSEMENTS . Disbursements for computer time, travelling, stenography, printing, materials etc SENIOR SUPERVISION Assume 2 weeks total 3,000 ESTIMATED TOTAL COST "$24,160 aeeai ate: Rane aw The above estimate Is based on the following schedule of hourly charges which would remain effective for the period of the study and report. Ce a Principals and Executive Engineer Ove ve fe Specialists | , Evsineoing Se Senior Engineers © ; : “attinont “| intermediate Engineers o pre “S)o7 7} . whe FID © Junior Engineers _ s Senior Draftsmen Intermediate Draftsmen Clerical Staff zee ane Sere ates os a All disbursements would be reifmbursable at cost.