Lo. ll. (b) other engineering costs which may include any or all of topographic Sulvey, engineering Survey, relevant administration, tender documents, tender call, tender .analysis, contract administration, construction Survey, inspection and Preparation of aS~-constructegd drawings will be as reasonably the applicable Sections of the Works, except that the design costs for the Pump Station Outlined in Clause 1.7 shall be in accordance with the "Blue Book” Fee Schedule as Published by the Association Of Professional Engineers of British Columbia. fn Genstar or Westview gave instructions for such design. The finding of Such a referee Shall be binding on all parties to this Agreement and the Other party in having said drawings Prepared by the engineering consultant, which costs shall be included and Tecoverable as Provided herein. Postage Prepaid, to the address of such party set forth at the beginning Of this Agreement. Any such notice Mailed as aforesaid, Shall be deemed to have been received on the fifth business day following the date of Mailing.