12, 1991/191 From the City Engineer, July 3lst, 1991 regarding the Fremont Connector Study. Moved by Alderman Wright: Seconded by Alderman Keryluk: That the City of Port Coquitlam appoint Urban Systems Ltd. as the City's Consultant for the Fremont Connector Study at an estimated cost of $4,815 (including GST). . Moved by Alderman Talbot: Seconded by Alderman Wright: That this item be deferred until more information is received on. the subject. Carried. From the City Engineer, July 31st, 1991 regarding a Request for a Catch Basin at 2871 Coast Meridian Road. Moved by Alderman Wright: Seconded by Alderman Gordon: 1. That the City of Port Coquitlam approve the installation of a catch basin in the road Right-of-way at the entrance to the driveway at the north property line of 2871 Coast Meridian Road at an estimated cost of $1,500. Ze That $1,500 be allocated from the Public Works Special Reserve Fund for ‘this purpose. Carried. From the City Engineer, July 31st, 1991 regarding Ditch Improvements 1945 Cameron Avenue. | | a “Moved by Alderman Wright: - Seconded by Alderman Gordon: That the City of Port Coquitlam extend the 450 mm diameter storm sewer front of 1945 Cameron Avenue. for a distance of 3 metres based .on estimated cost of $1,000. oO | That $1,000 be allocated from the Public Works Special Capital Reserve Fund for this purpose. - rs ee Carried.