yen WENT yy este Engineering Department: 1. Prairie Avenue Road widening 6.25 meters (1/2 + 1) Fut. 10.5 c/c Barrier curb and gutter and boulevard Sidewalk Ornamental street lights Storm sewer Pole relocation Probable sanitary sewer upgrade Property dedication for intersection improvements ).C.C.'s Shaughnessy Street Road widening 8 meters (1/2 + 1m) Fut. 14 c/c Barrier curb/gutter and boulevard Sidewalk Ornamental street lights Pole relocations No entrance to site from Shaughnessy permitted. Building Department: 1. The Buildings are required to be sprinklered under the City Bylaw. 2.. A nine meter right-of-way is required for fire access for a building exceeding 600 square meters in building area. 3. A Building Code review will be done at the time of building permit application. | Parks and Recreation Department: 1. Landscape requirements to be approved by Parks and Recreation Department. i oe 2. Concern regarding proximity to Poco Trail. Ensure that park strip along the river is retained. Fire Department: No comments. R.C.M.P. 1. Concern with relaxation of parking requirements. 2. Underground parking should be secured with a door. 3. Playground area should be secured with fencing. PAGE soedl