HUNTER LAIRD ENGINEERING LTB. 214 SIXTH BTREET NEW WESTMINSTER, 8.0, VOL 3AZ DAVIO W. LAIRD, P.Eng. PAM: (C64) S35-8718 DECLAN J. ROONEY, P.Eng. VIGTOR WERCHOMLAD, A.So T. (608) ean FAX & MAIL June 28, 1989 Meridian Industrial Park Ltd. Our File: 2325 c/o Beedle Construction Ltd. 5367 Kingsway Burnaby, 3.C. V5H 2G1 Attenciom: Mr. Colin Beedie Dear Sir: Ra: Storm Sewer for Future Extension of Kebet Way As requested, our cost estimate to construct a storm sewer and connection to Lot 22 at the southwest end of Kebet Way is $80,000.00 This estimate allows for extending a storm main from Lot 22 along the future extension of Kebet Way, through a right-of-way between two future lots to the Mary Hill Bypass together with the enclosure. and infilling of the ditch paralleling Mary Hill Bypass to outfall at the existing flood box adjacent to the Fraser River. The estimate also includes one storm connection for Lot 22. We trust the foregoing is the information you require. Please call the writer should you have any further questions or require any additional information. Yours very truly, HUNTER LAIRD ENGINEERING LID. Ae lens | Roomy Declan J. Rooney, P. Eng. JKC/ob as ier MNS Naa NT RET eT ES