: CITY OF PORT COOU'TLAM THE CORPORATION OF THE ENGINEERING CPT. CLYY OF PORT COQUITLAM Nee pop Wink FILE # MEMORANDUM TO Igor Zahynacz, P.Eng. City Engineer Andrew de Boer Project Engineer December 13, 1991 1.0 RECOMMENDATION - That two concrete wheelchair pads be installed at the Wilson, farside Kingsway bus stop (east of the new Wilson medical centre) at an estimated cost of $600. 2.0 BACKGROUND B.C, Transit has requested the installation of wheel chair pads at the Wilson, farside Kingsway bus stop (east of the new Wilson Medical Centre). Two pads will be required as per the attached sketch. The pads will facilitate drop off wheelchair passengers using the lift equipped buses. 3.0 COST The estimated cost for the installation of two pads at this bus stop is $600 (see attached). Sd Andrew de Boer Project Engineer