“a a bales ee ate vie H * me vt fasact ae he P as 41 SCHEDULE "A" - Page Two The Works included are those works identified in the following two reports: City of Port Coquitlam - Engineering For Master Drainage Plan - Northeast Sector Development - December 1990 as prepared by Dayton & Knight Ltd.; and City of Port Coquitlam - Northeast Sector Development Strategy - A Comprehensive Development Planning Program - March 1991 as prepared by Urban Systems Ltd. . These works are generally described as the general engineering calculation for the master drainage plan for the Northeast Sector Development and the selected alternative of floodproofing using Alternative no. 1 in the Dayton & Knight report; the design and construction of the pump station ‘sizing and components that result from the engineering work; the design and cleaning and re-establishing of drainage ditches along Dominion Avenue, Burns Road as well as other adjacent and integral drainage ditches making up the storm water management system for the Works; inspection of all works and certification to the City that they have built in accordance with the approved drawings and specifications.