“he -3- Section 1.6 Buttes of the Ovaez 2.8.1.0, . . 1.6.2. Every evaer of preperty shells () Uf aay wrk fer viich o Poralt is mized ty the p : . fa) permit the Building Iecpecter to enter say beflding se prontocs ef chis By-lew 2s commenced before « Paratt ho beea sbeained, the Pernit fea 6 ony Tecconable time for tha purpose of adzintateriag o¢ enforcing this By-law; &0 specified in Schedule A, Ber C (whichaver is applicable) shall be doubled. . (e) obtain, vhere sppliczbdle, fron the Bufléiag Insrortor, peratia 1.5.2. Swary permit is issued vpoa . . velating te building, soning, grade, sevore, vatermaina, plucdiag, signs, blasz- (a) the condition that construction ia te be etarted within eix tag, street occupancy, electricity, highvays, and all other pereits required ta moaths from the date of issuing of the permit; econsectiog with the proposed work: (eb) the condition thet construction 1 wot te be dlocoetteced sr (c) give at least 48 hours’ notice to the Building laspector of Guapended fer a period of mra thea efx mcaths; the fatcation to start work om the building site; (c) the conditdon that conariuction shall not extend beyead a (4) givo et least ews regular Municipal vorking deys’ astice te partied ef tvalve months if the Perait Value is $25,000.00 e¢ less of twenty the Building Inspector and obtzia permission to continue: Seer weaths if the Permit Valve excesds $25,000.00; peowided, thet shoald the 4. after forms for footing or foundation are coupleted but Censtrection extead beyosd the approved period of tina s naw peruit ehell be before any concrete is poured; asd before peraission Co ebtatosd before the coatiousnce of ths work aed such new parait shell ches Coatiaue is granted thera shall be deposited with the Ciey apoly to the whole of tha atructure, efther exiatiag of proposed, @ plot plan prepared by a ragistetad Yritins Colwbia Load 4.5.3. Ths application referred to in Subsection 1.5.1 Surveyor verifylag the locatisa of tha foundattosa. (a) be wade in the fore prevideds after reaoval of fores end placing of dr. tikes ber (>) bs signed by the applicant; before i:ay backfilling 1s done against fowntation. Drein tc) steve the intented usa of the baLidizg; tiles must be covered vithia 4@ Soure after inspection. (4) Saclude copies ia duplicats of the specifications and scale when the framing ef the building is couplated bat before dravizga cf the building with respect to vhich the work is to be cacried oct any interior covering or axtarior cladding is installed. when chianeys or firspl are tad aod while the dimensions of che buildiaz, tha propoced uca of eich rooa er floer eres, the dimensions ef the lasd ce which the wulldiag le, ox fe to be situated, {coming {8 open to perait fospection. when the Dyilding fe ready for cecupancy but befere any occupancy takes place. wi. upon final completics. she grades ef tha stracts anc severe sduteiag che lecé (e) give written cotice to the Building Inspector vithia 30 days of Goupletica of che work desctibed iu the pereic; and . tha position, height and hoctsontal dieensioas of ali (4) obtain ax eccupsacy parnit frem the Building Laspacters prise veferred te in eubcleuse if1, acd buildings ea the laad referred ts ig cubcleusa £44, and (o} contain any other informstion required ty thia Sy-lez es by 8. eccupsacy ef a building or pert 2h 2 sttax the eetherity having fucindietion. wscching oc alteration af thet building or sert, of (£) foctude, ia eultisle, Lndustetal and cescercial ueea, a lend- 45. change ta the eless of eccepaccy of cay tutiding oc pare theresf, ocaping design, sad such dasigs ehstl fora an Sategtel part cf the applicetice. > daclude @ all pleas fer psressect fem + & a soe cet7 of all 8 “« retest ty the 1.6.2, Whenever the character ef tha prepesed work requires techaics? City. tacwledge relating te reinforced concrete, steal, tiaber construction or ptee