a! Lye yh yh ny este tel COMMENTS FROM OTHKR DEPARTMENTS: Engineering Department: Le 7. 8. Dixon Street to be widened on the east side to obtain a full road width of 10.5 metres curb to curb from Kingsway Avenue to the cul-de-sac complete with barrier type curb and concrete sidewalk. Watermain to be constructed on Dixon from Kingsway to the south property line of tha development complete with fire hydrants and service connections ss required. A dedication of 3.0 metres for road and a corner cut-off ia required on the east aide of Dixon. No vehicular accesa to Kingsway to be permitted. (Note: Applicant has been notified of this requirement and will provide ravisions). Conetruct concrete sidewalk along full frontage of Kingaway und Infil1 axieting curb letdowns. Sanitary aud atorm connections to be installed by City at developer's cost at building permit epplication. Site to be serviced with underground Hydxo and telephone connections. LT aad Development Coat Charges will be assessed at building permit application. Building. Department. 1. 2. 3. The fire access route and the Location of the main entrance to the building will require further review by the designer. A revinion is forthcoming from L.0. Lund & Associates. A building coda review will be done at the time of the building pezmit application. Flood plain criteria will apply to this project. Parka_and Racs: ation Departments i. Landecaping to be approved by Parks and Reereation Department. anal