THE CORPORATION OF THE CITY OF PORT COQUITLAM -2- The Committee has not yet dealt with the other recommendation of the report, namely to change the present 24-inch main to a high pressure ‘system. This will be dealt with at a future date. However, as the options are very close together in cost, this report will be used as the basis for revision of the water development cost charges which will apply to the Genstar area. Respectfully submitted, Va F.E. Petérs, P. “Eng., City Engineer.