-16- THE CORPORATION OF THE CITY OF PORT COQUITLAM LAND USE CONTRACT SCHEDULE " Secticn 1 = Works to be constructed by Walter Cordon Mitt and Clara Laverne Miec a& provided in Section 12, . Approxizate Amount of Deposit Required Type Cost Breakdown by Way of Letter of Credit Batermafas 8,135.00 ) Store Sever Mains 10,256.00 } ocd Construction 2,009.00 } Zoulevards 793.00 } ~~ = = = $27,737.00 Underground Electrical _- 1,500.00 ) , Sidwuales 4,580.00 } Lane 2,092.09 } ) Pole Relocettion 1,500.03 ) Section 2 = Asounts to be paid to the Municipality as provided in Section 12, Payment Required ยง Vaterzain Tle-in _ . 1,400.00 varer Maintenance Fee . 25.00 Stora Sewer Tie-in 1,950.06 Parcel Creation Pee (1) & $10.00 10.00 Plans Approval Fee - 2.08 42 Engineer's estinste for inspections 1,109.00 24 Farcels @ $300.00 each for Future Water Capfral Expenditure Fund 7,200.00 Total 12,696.00 Water and sever connections vill be estinated at tine of building perrit application. The Dollar azounts stated in Section 1 of this Schedule are based on the City's Preliniaary E: cineering Besien and Preliminary Cost Estimates. As a result of Final Engineering Design to be carried our by the Developer, quantities, sizes, ete. right vary from thar determined from the prelininary work ane the Cicy does nee in any way ensure that actual increased costs resulting fsoz the Final Approved Engineering Design and Tender Call will not occur. Any Rereased costs over and akove the stated bonding amount of $27,737.00 shall ba the respoaxibiliry of the Developer,