Saath oh EAA rg % Reh ncn * at) eens 86702794 14149 1 604 684 5968 HAMELTON ASSOC Kagineceing aud Yeh Bloor ‘Telephone: O04 / OHA 4188 Phanolag Consultants 1199 West Hastings Hacsimile: G04 G81 S9DK Viarcouiver eitisty Catania Crssadia VOE STS May 31, 1994 The Corporation of the City of Port Coquitlam 2660 Shaughnessy Street Port Coquitlam, B.C. —-V3C 248 Attention: Mr. J.B. Yip, P.Eng. Deputy Clty Engineer Dear Sirs: Re: Lougheed Highway & Coeet Meridian Read, Clty of Port Coquitlam Extension of Eastbound Left-tur Lane - Proposal for Engineering Services Further to our meeting on May 27, 1904 regarding tie extension of the eastbound left-tum lane at the Intersection of Lougheed Highway and Coast Mericlan Road, we are pleased to submit _ the follawing proposal for your consideration. in preparing this proposal, we have visited the site and reviewed Citys letter to the Ministry dated April 8, 1994 and the accompany sketch plan showing the extent of the roadwork. As weil, We have contacted Mr. David Lee-Young of the 7 Ministry and ft is our. understanding that the Mintatry dogs not require trattic signal or slactrical ~ ypgrading. The adjustment ter timing and cycle tength of the tratiic signal controfler wili be done by the Ministry. The acope of the detailed deaign and construction management work forthe * eft-tum lane extension will Include the following: | Petallied Oesign The review of existing Lougheed Highway ae-budt drawings. Tha topographic survey for the purpose of design. The datalled design of the left-turn taro geometry based on the approved preliminary design plan (Caya Sketch Plan dated May 4, 194) including the associated road drainage for Ministry's approval. | Tha preparation of construction cost estimate based on the detailed dasign. “The tlaigon with the Clty arid tho Ministry of Transportation and Highways. me JUN-@2-1994 14:50