Page 4 - 7 7 Do - _ September Tith, 1972 a). Firstly, a roof drain to take water away from the 7 ‘prisoner unloading area. $328.00 mS b) _ Light proof grill = prisoner area - $67.00 - c) Additional steps - walkways: the absence of these steps Constitutes a hazard to the public. - $277.00 a “d) ° Emergency services rendered to install identification untt ona temporary basis. 2 $36.00 - ea). Finishing trim, mahogany door- lobby. $174.00. .. Total changes: | $932.00° - recommended for payment, There is a request for additional shelving units to provide pickup boxes for each individual R. C. M, P. member. This item can either be provided by the.contractor on a : basis of $7600.00 for the complete.unit, or can be budgeted for next year in the annua} budget. It is my recommendation ‘that it be done now under the provisions of the Federal Loan . Programme, . In addition, a unit on casters should be provided ‘for the Communications Room, to contain all necessary forms toys eper es salong with a Yocal file. This item is an additional “22 A metal box..will be required as a key holding unit, in the amount.of $75.00. ‘ . , ee ; ‘Lastly and hopefully finally, the architect has suggested . , that an allowance be made for some. planting to disguise the ; transformer and some small.plants for the main lobby of the . Justice Building. It was recommended that.an allowance of $200.00: be allocated for. additional landscaping. .. All of the above are costs both incurred and estimated, _ and are within thé estimated budget inclusive of all. fees and Should not amount to more than $710,000.00 for the entire project. Monies are available from the Federal Loan Program to cover all items enumerated in this report. _D. C. Reed oo “MUNICIPAL. SOLICITOR . DCR:hg