eee 5 a eet ihe THE CORPORATION OF THE CITY OF PORT COQUITLAM MEMORANDUM BR. Kirk DATE: Marea 12, i992 oe City Administrator re LR. Zahynacz, P. Eng. City Engineer tks Committee Meeting of March 10, 1992) That Council approve the expenditure of $2,000 for the placernent of rip-rap protection along the north and south slope of the Coast Meridian Barge Ramp. eohuis ; That $1,162.72 be allocated from the Future Capital Reserve for this purpose. The Public Works Committee considered the attached memorandum from the Engineering Technician dated February 26, 1992 regarding a letter dated February 11, 1992 recommending that rip-rap rock protection be installed along a portion of the north and south face of the Coast Meridian Barge Ramp at an estimated cost of $2,000. | — During the winter there has been erosion along portions of the north and south face of the Barge Ramp due to rains and tidal variation of the river levels. | There is $837.28 available from a Fraser River Harbour Commission Grant which could apply towards the $2,000 required for the slope protection at the Barge Ramp. | In order to prevent further erosion in this area, it is recommended that the slope pretection be installed at this time. | IRZ:gc Attachment Treasurer’s Comments I verify that there is sufficient funds in the Future Capital Reserve for this purpose. land, City Treasurer