June 22, 1990 City of Port Coquitlam -~2- We understand that changes which may have occurred in the past four years include not only road reconstruction and lighting installation by Genstar but also storm sewer installation and possible reconfiguration of legal property lines in the area. We also note that there are proposals to install some sanitary sewer facilities in the area of the road to be reconstructed. We confirm your agreement to supply us with a package of current legal plans, as-built drawings and design proposals for incorporation in our design. At this time we understand that you wish us to revise and extend our design, to cover the remaining section of road to be reconstructed, to complete the ornamental streetlighting system and to instal? catch basin drainage connected to the existing starm sewer. 2.0 WORK PLAN In completing this assignment we expect ta carry out the following tasks: .l Field survey of approximately 220 m of Mary Hill Road plus a portion of the Mary Hill Bypass. Compilation of a survey base plan for the area covered by the new survey. Preparation of three plan-profile drawings at 1:500 scale for the roadworks and drainage system. Revision of roadway.and drainage construction details to suit the new design standards. Revision of roadway lighting plan to extend the system to the Mary Hill Bypass and accommodate the system already installed. Revise the specifications prepared in 1986 to include any additional work and update the work carried out at that time. ASSOCIATED ENGINEERING