f Hib e, ti nun a ae Page 4 ~ cont'd P COST ESTIMATE DAVIES/HASTINGS ROAD IMPROVEMENT HAX LOUGHEED TO PATRICIA: no water required No sanitary required storm is adequate “existing curb & gutter @ 11m spacing ROADWORKS: 130m C & G $30/n 510 Im sidewalk x 1.5 = 765 m2 x 21.50/m2 1278 lm asph bike path x 1.5=1917m2 x 19,5/m2 streetlighting @ 105 m x 33.0m (both sides) streetlighting @ 52.50m x 350 (one side) Total + 25% cont Total PATRICIA: HASTINGS TO WOODLAND: storm required water O sanitary OK. ROADWORKS: pat 500 m of road recon @ 250/m (10m width) ie 800 lm of "B" C & G @ $30/m 500 Im of sidewall x 1.5 = 750 m2 x 21.50/m2 1000 m of asphalt bike path @ 19.50/m2 500 m of streetlighting @ 105/m 100 m of 300 dia @ 125/n 2 1050 mm manholes @ 1500 ¢a 4 CB's @ 1750 ea Total + 25% cont Total IDB/ca engcln 165