tal wen i¢ 11.4.2. 11.4.3. 11.4.4, 11.4.5. 11.4.6. the anticipated date of completion; classification of the building as to types occupancies; number of stories of buildings; gross floor area of each storey, and allowable live loads for each floor area; such other information as may be required to illustrate the essential features of the building. At least 24 hours prior to a requested occupancy inspection, the certification required in subsection 11.4.1, shall be supported by submission of the following reports: 11.5.1. 11.5.3. proof of compliance for all materials, equipment or methods of construction, when required by the Building Inspector; where the complexity of the project or portions thereof required supervision by an Architect or Professional Engineer as a condition of issuance of the building permit, certification that the work complies with all requirements of the Building Code and this Bylaw; a “Contractor's Material and Test Certificate”, once the sprinkler system have been flushed, inspected, and tested to meet NFPA~13 standards; a “Certificate of Verification" (or equivalent) together with the manufacturer's (inventory) “Inspection Report", after the components of all fire alarm systems incorporating annunciator panels, have been inspected and verified to meet the manufacturer's specifications and the Building Code, and the whole system or applicable portion thereof hag been teated by the manufacturer, or owner and installer.