4, BACKGROUND INFORMATION The following will be provided by the sponsoring Municipalities: Planning documents Legal base mapping Contour plans with 2 meter contour interval Air photos of study area. 5. DELIVERABLES The consultant will provide a functional design report containing alternative methods for the river crossing and plan /profile of the access roads from Coast Meridian to Ozada, type of structure, cost estimates for construction and maintenance, phasing possibilities and an environmental impact statement. Include design procedure, cnteria, concepts, evaluation and recommendations based on the lowest long term cost. 6. GENERAL Study directors for the Cities are Jeff Yip, P. Eng. (Port Coquitlam) and Ken Wright, P. Eng. (Coquitlam). The Cities will share the cost for the report. One copy of a proposal should be submitted to each study director by 1993 June 22. ENQUIRIES J. Yip, P. Eng. Ken Wright, P. Eng. Deputy City Engineer Deputy City Engineer City of Port Coquitlam City of Coquitlam 2580 Shaughnessy Street 1111 Brunette Avenue Port Coquitlam, B.C. Coquitlam, B.C. Phone: 944-5411 Phone: 664-1532 Fax: 944-5467 Fax: 664-1654 ATTACHMENTS Appendix A: Study Area Appendix B: EMME II Transportation Modelling Zones Appendix C: _ Sample "Level of Effort” Breakdown