be hired immediately to commence design and preparation of contract drawings and specifications for the two pump stations. The Committee recommends that Crippen Engineering be used due to their familiarity with the new flood boxes and wet wells and due to their recent completion of the Cedar Drive pump . station. Respectfully submitted, ‘ ‘ F.E. Peters, P. Eng., City Engineer [WW , SOG AR,