nace: oe eo + SA 7 CRIPPEN ENGINEERING LTD. 1605 HAMILTON AVENUE / NORTH VANCOUVER, B.C, / CANADA TELEPHONE: (604) 985-4111 / TELEX: 04-352629/ CABLE: CRIPENG MAILING ADDRESS: P. 0. Box 86698, North Vancouver : B. ©., Canada, V7L 4L2 7 December 1974- ur. Ve Borch, P. Eng. City Engineer City of Port Coquitlam 2272 McAllister ‘Port Coquitlam, B.C. Reference: City of Port Coquitlam Flood Protection Works Internal Drainage Study File: to405. 200. 001 Dear Mr. Borch: We wish to confirm a discussion between yourself, Robert Bland and myself on 19 November concerning terms of reference for a proposed study you wish us to undertake in order to evaluate alternate internal drainage arrangements in certain selected areas of the Port Coquitlam Flood Protection Works. The three selected areas to be studied comprise Hyde Creek and Cedar Ditch, Harbour Road, and Prairie Road and Dominion Avenue. . it Ts our understanding that the scope of the work envisaged in each of the selected areas should include the following: ee: hydrological study to estimate the instantaneous flow resulting from; rainfall of 5 year return period, rainfall of 10 year return period, and, rainfall of 25 year return period: Preliminary design of the main drainage ditches, pump stations and flood boxes necessary to dispose of each condition of instantaneous flow detailed in 1. above. Ditches would be considered up to 50% flow points: Estimates to determine the capital cost of the disposal required for each flow condition in each selected area. ’ oT fos tt DEC - 7 1974