tt a ats te LALEa THE CORPORATION OF CITY OF PORT COQUITLAM TO Igor Zahynacz, P. Eng. DATE: February 26, 1992 City Engineer FROM: Collin Morris | Engineering Technician SUBJECT: COAST MERIDIAN BARGE LOADING RAMP - PROJECT NO. 302 The above site was investigated on February 25, 1992 and photos taken to show the results of tidal action and erosion caused by surface drainage. As can. be seen in photos #1 and #3 the surface drainage has caused severe erosion of the steep side slopes. | Placement of rip-rap on the slopes, from the end of the existing rip-rap adjacent to the concrete walls, to the existing dyke, would support the existing fill and offer the necessary protection. As stated in the letter from Associated Engineering a layer of quarry tailings, 300mm minus should be placed on the side slope. Associated Engineering has estimated that approximately 40m of material is required to cover both surfaces to a depth of 300 mm. Their estimated cost is $2,000 for transportation and placing. 7 | | | : | es To prevent further erosion in this area { would recommend that our forces proceed with the placement of this material at our earliest convenience. 7 | | AUedy x ie Miley. GF Morts- ' Engineering Technician CFM:ck : Attachments