SCHEDULE J To be submitted by each Professional Designer with Schedule K prior to the issuance of a Building Permit. ASSURANCE OF “PROFESSIONAL DESIGN" AND COMMITMENT FOR "FIELD REVIEW" City of Port Coquitlam Building Department 2580 Shaughnessy Street Port Coquitlam, BC V3C .2A8 ATTENTION: Director of Building Permits and Inspections Dear Sirs: RE: Address Owner Building Permit Application No. (the "Project") The undersigned hereby gives assurance that the professional design of the (initial applicable item/items): . a id ; Architectural __ Structural __.._ Mechanical Plumbing Fire Suppression Systems Electrical Geotechnical, Temporary Geotechnical, Permanent Site Services ——eereneen —Hereerneeremamene ed meena ed 2 ners components of the Project as shown on the pians and support documents prepared by the undersigned Professional Designer substantially conform to all applicable requirements of the current B.C. Building Code and other applicable safety enactments except for construction safety — aspects. Further, the undersigned will be responsible for “field review" of the above referenced components during constructiin as indicated on the attached “SUMMARY OF PROFESSIONAL DESIGN AND FIELD REVIEW REQUIREMENTS” (Schedule K). “p-eld reviews’ means such reviews of the work at the Project site and at fabrication locations, where applicable, as the undersigned considers to. be necessary in order to ascertain: that the work in the Project gubstantially conforms in all material respects to the plans and. supporting documents prepared by me for which the building permit is issued by the City for the Project, inclufieg kemag@g| records of all site = SGlc thegeof. :