hast BL Bese B2RYUH Nuss YLT Wd LUNG VLA A? rs n hives eCyweune vey COST ANALYSIS HYDE CREEK REG. CENTRE June24, 1994 Original Global Section Trades Budget Prelim. Goocd0 Admin. Constr. rnagmnt fees, incl super.& offic $254,000 $254,000 Reirnbursible costs $15,000 $15,000 O1000 General Requiremest | Parrnit $23,000 Survey $1,500 Insurance $7,820 Cancrete testing $2,000 Soils testing $3,000 Allowance for hydro and conn. fees $17,500 Bond trades over $50 000. 932,000 Hoardinas $5,700 Site security $14,000 Garbage fasc, 357,000 Phoins $500 Sanitary fase. $1,250 Proj. sign $710 First aid $22,750 Site telephone, fax $6,750 $6,750 Temp. indilities $15,689 $5,000 Janitorial $3,349 $3,349 Demoiition and asbestos rerrioval $110,504 $90,054 $101,568 Additional hoardings and patching included ($11,514) $32,454 Excavation and fill, incl site demo $109,974 $105,060 $98,813 | 56,187 Site improvemenis $15,000 ns iar We $15,000 pases aie vie Foundations, pool sir, , 5.0.G. $194.918 $168,447 $165,070 [| $3,371 Concrete supply (394M3) included $30,732 Reinf, st for fndts. and sog 310,875 $17,355 $25,080 Blockwork, venier, glass block $134,767 $134,767 $100,000 Stuctural steel, Decking $392,623 $335,000 | _ $340,272 Seismic upgrade $25,000 $25,000 Metal Fabrications $17,646 $20,646 06000 Camentry Rough carpentry $22,954 $10,000 Architectural Woodwork $79,684 $79,684 $45,415 07000 Thermai Elevator pit waterpmofing 2290 $290 Metal roofing in roofina $8,775 $6,333 Rooting ) $183,400 $174,625 |___ $136,996 Roof hatch - $725 $0 Therrnai insulaton « batt $7,955 $9,275 $10,800 Accousical insulation 31,260 in thermal A barrier / membrane $7,971 in stucco Masonry sealer Caulk control ints. $3,367 $1,650 Metal wail flashing $2,530 Firestopping 08000 Doors Doors and frames suoply $5,000 $17,640 $516,960 3680 Hardwere supply $29,715 $3,807 TWh av Inctall Mance framece hamiware "9a Les S™ $R AQN PAGE. 4 T41 4AN 1 jeter d Lod