September J 3, 1993/280 That $4,790.00 be allocated from the Special Public Works Capital Reserve Fund for this purpose. Carried. From the City Engineer, September 7th, 1993 regarding Award of Tender - Lougheed Highway Connector Project. Moved by Councillor Gates: Seconded by Counciller Talbot: That Council award the tender to provide Engineering services for the Lougheed Highway Connector Project to PBK Engineering Ltd. based on the submitted bid of $327,964.00 (including GST). That Council authorize PBK Engineering Ltd. to proceed with PART 1: Preliminary Engineering Report for the road and bridge design plus PART 1: Bridge Toll Facilities Study at this time only at an estimated cost of $111,112.00; and defer PART 2: Road and Bridge Engineering plus PART 2: Toll Facilities Engineering at a cost of $216,852.00 until a later date. That $111,112.00 be allocated from the Roads DCC Fund for this purpose. Prior to the question being called on t he foregoing resolution: Moved by Councillor Wright: Secon b ncillor Gordon: ~ That all references to toll facilities be deleted from the City Engineer’s recommendation, September 7, 1993, Award of Tender - Lougheed Highway Connector Project. Carried. Moved b ncillor Wright: con cillor Nn: That Council award the tender to provide Engineering services for the Lougheed Highway Connector Project to PBK Engineering Ltd. based on the submitted bid of $327,964.00 (including GST). That Council authorize PBK Engineering Ltd. to proceed with PART 1: Preliminary Engineering Report for the road and bridge design at this time only at an estimated cost of $111,112.00; and defer PART 2: Road and Bridge Engineering at a cost of $216,852.00 until a later date. That $111,112.00 be allocated from the Roads DCC Fund for this purpose. Carried.