Per eT de ghey Se a Make Pel wt evens nA DAYTON & KNIGHT LTD. Consulting Engineers PG CLYOO AVENUE 3S E57 VANCOUVER BRITISH COLUMBIA CANADA "ELEPHONF. (6041 922.3 3 MAILING ADDRESS 213 BOX 91757. WEST VANCOUVER BRITISH COLUMBIA, CANADA V7V 3N9 September 4, 1990 ‘ir. Igor Zahynacz, P.Eng. City Engineer City of Port Coquitlam 2272 McAllister Avenue Port Coquitlam, B.C. V3C 248 Attention: afr, Bussell Mammei, A.Sc.T. Dear Sirs: Reference: City of Port Coquitlam Contract No. 21.15.18 Construction Services for Handley Crescent Sewage Lift Station and Emergency Storag eTank As requested on August 31, 1990, constructing a gravity sewer lin g Handley Crescent Pump Station to the Freemont Pump Station. This option would eliminate the necessity of constructing a new Handley Crescent Pump Station and the City would only need to maintain a single pump station instead of two stations to service these areas. We offer the following comments for your consideration: 1.0 Gravity Sewer between Handley Pump Station d Freemont Pum | The first upstream manhole into the existing Handley Pump Station is MH 65-3. The inlet invert at MH 65-3 is 1,00 m elevation and the outlet invert is -1.20 m elevation. The distance between MIE 65-3 to the existing Freemont Pump Station is about 5265 metres, The existing Freemont Pump Station consists of two cells. Duplex submersible Flygt bumps are located in one of the cells. A 300 mm ¢ capped stub at -2.20 m elevation is provided in the second cell. The available grade between the two stations is 1.0 metres if a gravity line is constructed from MH 65.3 and connected tc the 300 mm ¢ stub at the Freemont Pump Station. ITEM | PAGE A? Wu