3 Ai THE CORPORATION OF THE CITY OF PORT COQUITLAM MEMORANDUM Igor Zahynacz, P.Eng. City Engineer Andrew de Boer Project Engineer April 7, 1992 RECOMMENDATIONS: 1) That the City approve the alternate Haney Stage Ti watermain allignment " proposed by the GVRD. 2) That Dorset Avenue from Shaughnessy to Flint, Flint from Dorset to Prairie and Cambridge from Prairie to the Lougheed Highway be, considered for the 1994. - Mill and Overlay program. | ee _pecngiom AND COMMENTS: ‘The GVRD has requested that Publics Works Committee review the proposed routing of the Haney watermain through Port Coquitlam and advise them on the. City's S position on the proposed allignment. oe 7 Attached i is a letter from the GVRD and a map of the proposed routing. The. map _. shows a routing along Kitchener/Dorset/Flint/Cambridge/ | lane south of 1800 — - Westminster to Oxford. From Oxford there are two Toutes proposed to connect to” the Lougheed Highway: | dL. “alternate x route - . south. on Oxford to the Lougheed Highway 2. east on ‘Westminster and south on Commonwealth to the Highway. “Tei is recommended that the alternate route be selected as the routing along” - Commonwealth goes through a residential are mice