DECLAN J, ROONEY, R.Eng, * HUNTER LAIRD ENGINEERING LTD. 9 cinasumous *S" #300-65 RICHMOND STREET, NEW WESTMINSTER, B.C. V3L SPS TEL: (604) 525-4651 FAX: (604) 525-5715 pepe M1. | beeen aS, OuFNE fa? City of Port Coquitlam |r nn AD. . MAR 14 ‘Gu? 2580 Shaughnessy Street 1 whe seemed fee BAe” hme FILE # oe Port Coquitlam, B.C. | be tine aetna wats ee V3c 2A8 +O foe Attention: Mr. Igor Zahynacz, PP. Eng. Dear Sir: | | Re Proposed Industrial Neve Kingsway/Maryhill Bypass for The Beedie Group 4 As discussed at our meeting last week, we are writing to request confirmation that the city will reimburse the developer for the cost of the pressure reducing valve stat:;on to be installed as part of the water supply system with this project. Our estimate for the pressure reducing valve installation is as follows: Supply and installation $50,000.00 20% Contingency | $0,000.00 Total Construction $60,000.00 Engineering Fees . Geotechnical Investigation (letter attached $ 740.00 Engineering Design, Contract Management ( ) 6,000.00 city administration and Inspection Charge (4%) 2,400.00 Total $69,140.00 8 6 1 2) a ~ ) We suggest that this amount be allocated for budget purposes but understand that all reimbursement will be based on actual costs supported by documentation. Please contact the undersigned if you have any questions with respect to this submission. Yours very truly, PAGE | HUNTER LAIRD ENGINEERING LTD. {£32. L\a-_Doww Declan J. Rooney, P. Eng. DIR/th cc. Beedie Group Attn: Mr. Colin Beedie (CIVIL ENGINEERS ° PLANNERS « SURVEYORS ©