“ a P elt ie se fa; 3 : } iy UN ERR Bn OUR Eh ao NER esi adie es Consulting Engineers Four consulting engineering companies were invited to submit proposals for the design and construction of the three watermain projects. Included were the Laurier, Devon and Burns watermains. All submitted proposals and my technical evaluation and financial evaluation are attached. Since this is a very straight forward engineering project the four consultants submitted very similar bids with the only difference being their estimated cost for consulting engineering fees. Based on my evaluation I recommend that Dayton & Knight Ltd. be awarded the engineering consulting works for the Laurier, Devon and Burns watermain reconstruction at a total cost of $59,272 including G.S.T. For budgeting purposes I recommend we budget for $68,000 which includes a 15% contingency over the consulting engineering fees. Financial The Laurier watermain is budgeted in the 1992 Water Utility Capital budget at $36,000. The Devon Road watermain is budgeted at $180,000. Both projects have previously approved Provincial grants. The Vincent watermain can be deferred and constructed in 1993 along with its Provincial grant. alts pay C.F. (Kip) Gaudry, P. Eng. Deputy City Engineer CFG:ck