eth Ug Le opines ons sient nt ea ein Capital Projects Page 2 of Works Yard maul Fire Hall # 1 As outlined above the replacement of these major facilities is estimated to cost $5.3 million. It is proposed that this cost be financed from our Tax Sale Reserve to be repaid by the sale of the present sites. Sale of these sites is expected to produce $6 million. Reeve Penk Consultants are nearing completion of the drawings to allow tendering for the construction of the park. The expected cost of construction is $3 million with the City paying $2 million and the Provincial Government through a Go B. C. grant paying $1 million. Our grant application has been in for some time now and has reached the stage where it is stalled until the City’s share of the funds are put into place, passage of the Tax Sale Reserve bylaw would do this. Tendering and construction would not take place until Provincial funding for 1/3 of the cost is received. Funds taken from the Tax Sale Reserve would be repaid to the reserve over a 20 year period costing $147,164 per year inclusive of interest. Annual, operating costs of the improvements to Reeve Park are expected to cost $60,000 per year. The annual costs outlined above will be funded from the City’s geueral tax revenues. Hyde Creek Ceatxe The proposal is to hire a consultant to develop a plan for expansion of Hyde Creek Centre. The consultant would: meet with the Parks and Recreation Committee and user groups to develop a conceptual plan for Council consideration and approval. take the approved conceptual plan through to production of drawings suitable for tender and the preparation of tender documents. Actual construction of the proposed improvements will be undertaken when sufficient funds are available in our Tax Sale Reserve to fund the expansion in the same fashion as the Reeve Park improvements mentioned above.