Golder Associates Ltd. CONSULTING ENGINZERS ; FACSIMILE TRANSMISSION DATE TRANSMITTED: September 19,1990 FAX: 291-5163 TO: Mz. CP. Yeoman, PEng — REF = Associated Engineering (B.C) Lia = OF PAGES: L Gnelodine Cover sheet) FROM: N. Wedge PROJECT/PROPOSAL & 852-1221 NOTES: Re: Substitution of Sand Fill For Sand and Gravel Fill Mary Road Construction Port Coquitlam, B.C, - Further to our reeenr discussion, we understand that prospective contrectors for tae above project have requesied that consideration be given to the use of river sand fill in place of the following Sill types required by the specificarions: Type 1 - Free draining, weil greded i50 mmm. minus sand aud gravel with | less than 2% passing 20.075 mm sieve. Type 2 - Well graced, 150 mm minus sand and exavel with less than 5% passing a 0.075 mm sieve. The Type 1 Sil is to be used for a 600 mm thick drainage blanket to be placed on the existing slones at the base cf the new road embanionent AE and the Type 2 Sil is to be used as the general embanlment fll Embantment slopes will be constructed at 1.5 korizontal to 1 vertical Considering the function of the Type 1 and Type 2 Gl mazerials and embantanent Slopes, we reconemend that river sand not be accepted as a substimire for the specified Type i and Type 2 sand and gravel fills. we ~ eae epee. FRG Se Poe womens mee st ae meee . Vij pe ay ey, - lL, ID OF SF. Follow up in “ , Gg. SEE Oo ptul lin. cme tee Me If there are aay problems with the mssion.onif it is incompler. please call Barb at 879-9266 as soon as Possible. M_| PAGE See ee eens eons - SEP 19 96 J 3705 ™ 604 23! 6163 PAGE. oas