ih see THE CORPORATION OF THE CITY OF PORT COQUITLAM MEMORANDUM December 17, 1992 TO: Janna Taylor, Parks & Recreation Director FROM: Larry J. Wheeler, Recreation Manager/Deputy Director SUBJECT: Root Tender - Hyde Creek Gym & Lounge Recommendation: It is recommended that Marine Roofing Lid. be awarded the contract in the amount of $91,237.00 to re-root the gym and lounge at Hyde Creek Recreation Centre. Purpose/Probiem: The purpose of this report is to provide information and a recommendation regaraing the tenders received for the re-roofing of the Hyde Creek Gym and ounge. Background information: We have been experiencing a major problem with the gym and lounge roof leaking for the past year. We had initially hoped we could use temporary patches until the building was renovated at some future date. However, the problem has gotten progressively more pronounced during the year and therefore the roof needs to be replaced as soon as possible. However, to ensure that we were not risking wasting money by replacing the roof then renovating, we waited for the development of the basic expansion concept. We then invited Vic Davies Architects to provide us with a basic set of specifications that would be consistent with their vision for the expanded/renovated portions of the complex. Northwest Inspection Lid. was contracted to develop detailed specifications, conduct on-site meetings, and review the various proposals. Their report is attached for reference. Alternative #1, as outlined in the attached report, is the preferred option as it ‘s consistent with the general specification as outlined by Vic Davies Architects. It allows for a minimum of R-20 insulation at the edges of the building with substantially more in the center. % BAVanten hah LEM Larry J. wheeler erie Enea) Aha: Nathe,