THE CORPORATION OF THE CITY OF PORT COQUITLAM MEMORANDUM MEMO TO: Igor Zahynacz DATE: July 9, 1992 City Engineer MEMO FROM: Gordon Voncina Operations Manager SUBJECT: Pavement Settlement in the Rosewood Area ee ee ee ee eee ee ee ee ee) Blaine Anderson, our Public Works Foreman II, has advised me that there are several areas in the vicinity of 2890 Rosewood which have settled as a result of road base or sub base failure. Several dozen small to medium sized birdbaths are evident along Rosewood, Larkspur, and Barberry, with the most severe case located at 2890 Rosewood. The road and driveway letdown have settled to such an extent as to allow water to spill over the driveway letdown during times of heavy rainfall. Several of the areas residents have expressed their concerns due to the settlement problems and resulting drainage problem. I would request that you review the photographs enclosed with the Public Works Committee for the purpose of obtaining budget funds in the amount of $3765 for the installation of one catch basin and lead. Respectfully submitted, /Sopdon Voncifta~ GV/AL rosewood VN neha ibaa tata iS {ich