ee HE ‘ " THE CORPORATION OF THE CITY OF PORT COQUITLAM Fa cn zeae JUN 2 2 987 MEMORANDUM TO: City Administrator June 17, 1987 “FROM: City Engineer SUBJECT: Construction of Pitt River Road - Public Works Committee June 16, 1987 Recommendation: That the project for construction of Pitt River Road from Shaughnessy to the Pitt River Bridge be put to public tender and that Associated Engineering be hired to provide contract administration services including tendering, pre=construction meeting, inspection, survey layout for contractor, testing, calculation of progress certificates, and preparation of as-~ built drawings. Background and Comments: The reconstruction of Pitt River Road is included in the 1987 Public Works Capital Budget with cost-sharing of fifty percent being recovered from the Ministry of Highways. The design has been comp!teted by Associated Engineering and approval has now been received for cost-sharinge The project must be completed in 1987 in order to qualify for sharing under the Secondary Highway Program. City crews will be fully committed during the construction season to construction of Mary Hill Road, Anita Drive, a portion of Wellington Street, and minor projects. It is therefore necessary to contract this project. [t+ Ts usual with contracted projects that have been designed by a consultant to have the same consultant provide contract administration services. This is practica! because any questions on the design can be handled by the designer. It is also necessary in this case because of the very heavy commitments that City staff have in keeping up with the development projects taking place throughout the City. The consultantis estimate for ali the services mentioned in the recommendation is approximately $29,000. This is based on the expected duration of the project of 13 weeks and includes costs of a solti testing firm to be hired during ‘the construction phase to ensure that adequate settlement takes