———— 72 Te “3 LAQUICELING Liat PROPOSAL FOR MATERIALS TESTING MARY HILL ROAD UPGRADING PORT UITLAM, B.C. 1.0 SUB~GRADE 1.1 Washed Sieve Analysis Specified frequency 1 per 5,000 tonnes per day Estimate 6 test @ $ 88.00 $ 528.00 Standard Proctor Density Estimate z test @ $115.00 Compaction Determination Specified frequency 1 per 1,000m2 Estimate 15 test @ $ 36.00 $ 540.00 Benkelman Beam (as required by engineer) Truck supplied by contractor Estimate 6 hr @ $ 46.50 S$ 2793.00 Sub-total $1,577.00 2.0 SUB-BASE AND BASE COURSE 2.1 Washed Sieve Analysis Specified frequency 1 per 2,000 tonnes per day Estimate 5 test @ $ 78.00 $ 390.00 Standard Proctor Density Estimate 2 test @ $115.00 $ 230.00 Cele eae tee on treed ape be ga teens pat gigas cod oc ee Compaction Determination Specified frequency 1 per 1,000m2 Estimate 20 test @ $ 36.00 $ 720.00 EES stn Fo nee a teary te Benkelman Beam (as required by engineer) Truck supplied by contractor Estimate 6 hr @ $ 46,50 279.00 Sub-total $1,619.00