phe rege B nae “a eye ® agence ar %, ire THE CORPORATION OF THE CITY OF PORT COQUITLAM B.R. Kirk City Administrator LR. Zahynacz, P. Eng. City Engineer pants re a uly 7, That Council approve the removal of approximately 200 metres of existing damaged curb and placement cf 200 metres of 1 metre wide gravel shoulder along the south side of the Lougheed-Meridian frontage road at an estimated cost of $4,745. That $4,745 be allocated from the Special Public Works Capital Reserve Fund for this purpose. There is approximately 200 metres of existing extruded concrete curb which has been broken and pushed aside along the south side of the Lougheed-Meridian frontage road near the Best Westem Motel. It would cost an estimated $8,138 for replacement of a new concrete curb and $4,745 for the placement of a 1 metre wide gravel shoulder at this location. | A gravel shoulder would allow vehicle parking at this location and is less costly. It is therefore recommended that the 200 metres of damaged curb be replaced with a gravel shoulder at the estimated cost of $4,745, pres IRZ:ck Attachments Treasurer's Comments: There are sufficient funds in the Special Public Works Capital Reserve Fund for this purpose.