3.09 Alternative Two is a water supply system which employs a larger 115 1/sec. pump station at Oxford and Mason in Place of an additional reservoir. This System would be somewhat more costly to operate at least until additional water storage is provided, Basic components include: 2 A. New 115 1/sec. pumping station at Mason and Oxford 200,000 to 250,000 2.8. Enlarge to 40 l/sec. existing Pumping station at David Avenue (Coast Meridian No.1) 125,000 150,000 2 C. New 200 mm interconnection of 200 mm on Mason Ave from Wellington to Coast Meridian 25,,000 35,000 ‘2D. New - 200 mm distribution main , on Millard from Coast _ Meridian to Camex 7 25,000. to 35,000 RANGE OF COSTS: — $375,000 to $470,000 eee NN eto 3.10 The service area for system Two would include: 486 potential one acre lots east of Hyde Creek, exclusive -Of Provincial and Ministry lands; 140 - potential RS-# lots north of Camex in the possible sewer areas; : potential RS-¢ lots south of Camex.in the possible sewer area; and potential RS-# lots in Camex Lots. “3.11 As with Alternativeone, Camex could proceed on the basis of initial “construction of Item 2A. STON MAAC EH aha gt BAS i eZ OM