THE CORPORATION OF THE CITY OF PORT coQUITLAM MEMORANDUM SEP 26 1983 TO: B. Kirk, September 20, 1983 City Administrator ' FROM: FE. Peters., P, Eng., City Engineer SUBJECT: Overlay of Pitt River Road - Public Works Committee, September 19th, 1983 RECOMMENDATION: unallocated fund In the Publ Savings from the Kin BACKGROUND AND COMMENTS: Sap : All atecess ‘to the Deveiopment will ATS also put Bypass ts Opened Pitt River Road wilt Serve as access from the :north to the Bypass, wa do not anticipate that Pitt River .Road wit | need to be widened In the near future but the surface condition is such that -i+ will need to be repaired and overlaid to Prevent further deterioration. ; wirbtgt Qe POT Sent Shenae a ae WA Sg The City has mada a Saving of about $65,000 In gSway Reconstruction Project. There $70,000 re In the unallocated The be pooled an overlay over part of Pitt River. Road in Such a Project will allow comptetion of necessary ‘link In our transportation network and. wil! provide larger base for the calculation of expenditures, capital wilt” Ae eat tam soasins Rene et: SE Lam Pete This work would be sim _ llar to what was done on Western Orive fn 1982 and the Committee recommends that It be proceeded with. Eng., 4 poF.&. Peters., P. City Engtneer TRIS eu ANA MONARO ne ee cee . TOT ae nea anetn ey Hye B55 LPN SP ey Rati ried