THE CORPORATION OF THE CITY OF PORT COQUITLAM MEMORANDUM Project No. 900-312 DATE: June 2,:1994 I.R. Zahynacz, P.Eng City Engineer Russ Mammel,EIT Supervisor of Design & Technical Services LEFT TURN LANE EXTENSION - LOUGHEED AT COAST MERIDIAN RECOMMENDATION: Award Hamilton & Associates the contract for the design, tendering and construction supervision of the 150 metre left turn lane extension on the Lougheed Highway at Coast Meridian Road, for a fixed fee of $8,560 including GST. The extension of this left turn lane noted above is a requirement of the MOTH and has been Scheduled for design and construction by the City in 1994. | ~ Hamilton & Associates was selected to provide a quote for their services on this project oo because of their familiarity with the area and their Engineering involvement with the adjacent — . Lougheed/Ottawa intersection. Because of the small size of this project, our normal call for _ proposals from a number of consultants * was not done. | The! $8, 560 consultant fee will come from Highway DCC funds, and construction costs (yet to: _ be determined) will be funded 98. 6% from DCC's. | . ce: “Jeff Yip, P.Eng: Deputy City Engineer