MEMORANDUM JAN 14 188 4 THE CORPORATION OF THE CITY OF PORT COQUITLAM | C CG U 4 C I | 0 Mayor and Council January 10th, 1980 Building & Protection Committee and : Public Works Committee Report of Joint Meeting held January 8th, 1980, IN ATTENDANCE: Mayor G.R. Laking - for Part of meeting . Alderman M.R. Wright Alderman P.F, Ranger Alderman E.W. Mabbett Alderman L.M. Traboulay F.E. Peters, P. Eng., City Engineer Mr. Saunderson of The Herald for part of meeting. Re: Cost Estimates for Pumping Station at Harbour and Dominion Avenue The Engineer reported to the Committee on cost estimates received from the consultant for the type ‘of Pumping systems we require at both locations. The estimates are said by the consultant to be on the conservative side but do not include B.C. Hydro costs for providing service to the Site, e based on providin ainder of Harbour Street . The ultimate requirements c.f.s,. use of storage capaci used as backup for major s Estimated Cost $96,150.00 10% Contingencies 9,650.00 Total $105,800.00 Dominion Avenue The ultimate requirements are one 30 c.f.s. pump in a high level pump station and one 30 c.f.s. pump Plus one 45 c.f.s. pump in a low level pump station. At the present time all runoff is combined in one high level. It is Proposed to install one of L2..0.