Page 4 of 5 AND HAVE AND TO HOLD unto the Grantee, its successors and assigns forever. THE GRANTOR HEREBY AGREES that for the purpose of installing the works initially, the Grantee may enter upon an additional fifteen feet of the Grantor’s property adjacent to the Statutory Right-of-Way. THE GRANTOR HEREBY COVENANTS and agrees with the Grantee that the Grantor will not erect, place or maintain any building, structure, concrete driveway or concrete patio, on any portion of the statutory Right-of-Way. AND THAT the Grantor will not do or knowingly permit to be done any act or thing which will interfere with or injure the said works and in particu- lar, will not carry out blasting on or adjacent to the Statutory Right~of- Way, without the consent in writing of the Grantee provided that such consent shall not be unreasonably withheld. AND THAT the Grantor will not diminish nor increase the soil cover over any pipe installed in the Statutory Right-of-Way without leave in writing of the Grantee. AND that the Grantor covenants and agrees with the Grantee that any and all chattels and fixtures installed by the Grantee on the said Statutory Right~of-Way shall be and shall remain chattels, any rule at law to the contrary notwithstanding and shall belong solely and exclusively to the Grantee. The Grantor covenants and agrees to allow the Grantee, its agents and servants, to enter upon the said lands as aforesaid to install, repair, maintain, inspect and service the said works, and shall not interfere in ‘ any way nor prevent any such person coming on the said land for such purposes. The Grantee hereby covenants and agrees with the Grantor that the Grantee: (a) will not bury debris or rubbish of any kind in excavations or backfill, and will remove shoring and like temporary structures as backfilling proceeds; : will thoroughly clean the site, raking up all rubbish and con- struction debris and leave the site in a neat and clean condi- tion; will, as soon as weather and soil conditions permit, and insofai as it is practicable to do so, bury, maintain, repair, and/o1 replace and remove all underground works so as not to interfere unduly with the drainage of the land; will, as far as reasonably necessary, carry out the construction maintenance, repair and/or replacement, and renewal of the saic works in a proper and workmanlike manner so as to do as Littl injury as possible; and, .