THE CORPORAT!ON OF THE CITY OF PORT COQUITLAM MEMORANDUM TO eR. Kirk, ity Administrator FROM: F.E. Peters, P.Eng., City Engineer SUBJECT: Roof Encroachment on Right~of-Way kk te oe nt te mo es ee RECOMMENDATION: That the builder on Lot 17, Plan 73394 be permitted to continue the construction of his building with a proposed roof overhang into the Sanitary sewer statutory right-of-way, subject to him antering into a Restrictive Covenant in the form attached; AND THAT the Mayor and City Clerk be authorized to sign the Restrictive Covenant on behalf of the City. Background and Comments: The attached sketch shows the fot and right-of-way down one side and the location of the projected roof overhang. Foundations for the house have been poured but no construction has taken place pending a decision by Counci!. the corner of the roof wil] overhang the right-of-way by about l-“1/2 feet at a height above ground of about 8 feet. This overhang would not create a Significant problem for us if work in the right-of-way is required. i The alternative for the builder if Council does not grant the Encroachment Agreement is to cut off one corner of the roct. This would result in a less pleasing appearance from the street. F,E. Peters, P.Eng., City Engineer FEP/al Attach: Maine FEP~04/08/87