cla POUT THE CORPORATION OF THE CITY OF PORT COQUITLAM MEMORANDUM MEMO TO: Igor Zahynacz City Engineer MEMO FROM: Gordon Voncina Operations Manager ra SUBJECT: Bus Stop, West of Shaughnessy and South of Lougheed Hwy. — (Task 10) | I have inspected the bus stop area indicated by Mrs. Brolese's letter. The oa general condition of the bus stop and surrounding area was found in good condition, however, a tree root is protruding up from the ground adjacent to the bus stop bench... 7 Jn addition, several sections of pavement show signs that other roots are | attempting to push through the asphalt walkway. | It is recommended that the tree and-root system be removed and that the area be a 4 . 2 paved and seeded. a | | ee ara oO : 7 ‘The estimated toal cost for the project is $1438.00. | . Should you wish to proceed with this work, an application to Council will be oe “required to remove thetree. == a, | ae Se Respectfully | submitted, 4 ee ¢t Yrcexe— | CIN OF PORT COQUITLAM ~~ ENGINEERING. DePT. . Cost toy fSOwovi rR pols ht oe PILE Beene ene | Gordon Voncina extending as phal pad "750.00 |e GV/al