apie ae ie es as oN # ee feo 5 RES Sept 24,1991 File: 900-116 PENNY PLACE PUMP STATION - AWARD OF CONTRACT There were five bids on the abpve noted tender. Tri-Tech Industries Ltd. $374,804.95 Arctic Coast Construction Lid. $382,632.00 Lockerbie & Hole Co. Lid. — $395,352.16 Peter Van Vilet Contracting Lid $412,228.20 Gisborne Design Services Lid. $464,737.00 Our estimate , with contingencies was $ 465,000. plus engineering. Because the low bid was judged to be a "qualified bid” we will be recommending that the contract be awarded to the lowest acceptable bid as submitted by Arctic Coast Construction Ltd. es ; _ Full report will be submitted along with the technical information that Council Hees Me requested regarding the interconnection of the two pressure zones. fe Summary results are attached. | =—asS | KIP GAUDRY me (fio t rw kis ry Uo GS Ua NEN Be eee