(c) All of the fixtures in Table 7.4.9.A of the British Columbia Plumbing Code with the addition of the following are subject to. the above fees: | vacuum breaker hydraulic equipment sewage sump oil interceptor | grease interceptor OO gasoline interceptor neutralizer double check valve assembly (d) No fee or part thereof in payment of a Plumbing Permit; as required .by this By-law, shall be refunded if the work authorized by. the permit has been commenced; but if no work has been commenced and a Plumbing Inspector so certifies, the City Treasurer may refund 90% of the Plumbing Permit Fee; however, no refund shall be made om amounts of less than $25.00. 3. Schedule of Building Demolition Permit Fees Value of Structure to be Demolished Permit Fee Payable $ up to $1,000.00 ...... ccc cee eee eee Nil $1,001.00 and over ..... ccc eee eee eee 5.00 Reinspection Fee Where, due to noncompliance with the provisions of this By-law or to unsatisfactory workmanship, more than two inspections are necessary, for each inspection after the second inspection, a fee of $21.00. ail yaa AN yea ait