FAS eee MS Tv Ae te tre Male ea! too otrasaed THE CORPORATION OF THE CITY OF PORT COQUITLAM B.R. Kirk City Administrator COUNCIL pec 10 1990 December 6, 1990 FROM: I.R. Zahynacz, P. Eng. City Engineer SUBJECT: HYDE PARK SANITARY PUMP STATION REPAIR Recommendations: l. That Council approve the repair of the electrical and pumping systems in the Hyde Park Sanitary Pump Station which is estimated to cost $15,500.00; 2. That Council allocate $15,500.00 from the Sewer Capital Reserve for this purpose. Background & Repairs: Attached is a memorandum from the Operations Manager describing the roblems and the costs related to the Hyde Park Sanitary Pump Station repair. Also attached is a site plan for the pump station. The Hyde Park Sanitary Pump Station operates with two pumps. These pumps have weak electrical systems and pump #2 was shut down due to continuous running during the recent heavy rains. Although pump #2 is now temporariiy repaired, problem could reoccur in the there is concern that this mar future. It is estimated to cost $15 ,500.00 to upgrade the electrical system from a 230 yolt to a 600 volt three phase system. IRZige Attachments (2) TREASURER'S COMMENTS: I verify that there is suffi for the recommendations above cient funds in the 1990 Sewer Capital Reserve Fund | [fiat City Treasurer st