SCHEDULE "B" SCHEDULE OF SECURITY RELEASE WATERWORKS At such time as this work has been completed less tie-ins, flushed, hydrostatically tested, disinfected and finally flushed to the City's standard, 90% of the amount required as security for waterworks installation will be released, less 10% to cover as-constructed drawings if these have not been completed. SANITARY PUMP STATIONS At such time as this work has been completed (with the exception of raising manhole frames and grates) 90% of the amount required as security for sanitary sewer installation will be released, less 10% te cover as~-constructed drawings if these have not been completed. ROADS, LANES At such time as the road work has been completed with the exception of hot mix pavement, 50% of the amount required as security will be released. At such time as all the road work has been completed with the exception of the final lift of hot mix pavement, 70% of the amount required will be released less 10% to cover as~-constructed drawings if these have not been completed. At such time as all of the road work has been completed, 90% of the amount required will be released. CURB & GUTTER At such time as this work has been completed, 90% of the amount required will be released, less 10% to cover as-constructed drawings if these have not been completed. CSM/3jg/4395/CSM19