MU-WESTS — PRobes#t. AEA EL PEL PLC Wage dibbes OLVELOPMENT CORPORATION LTD. November 15, 1979 The City of Port Coquitiam 2272 McAllister Avenue Port Coquitlam, B. C. V3C 2A8 Attention: Leisure Activities Committee Dear Sirs: Tt refer to our several recent discussions with regard to final completion of the facilities in Fvergreen Park and to turning the park over to the city. ; t . There is’ general agreement that the work is now virtually complete and that the construction has been carried out in line with the standards set by the Land Use Contract and the Parks Speci- fications and drawings. The Land Use Contract set a standard of $100,000.00 for park improvements and facilities. The cost to date for the completed work, not including repair and maintenance, is $110,291.26. In addition, there are several areas in which we have done a significant amount of work (in excess of $18,000.00) beyond the work envisioned by the Land Use Contract: 1. An automatic underground irrigation system was installed with Nu-West bearing the cost of the irrigation system and the city bearing the cost of the automatic equipment. 2. At least eight additional storm water drains have been oo installed along the perimeter of the park. 3. The area along Cedar Drive, lying between the drainage ditch and the fence, has been prepared, sceded with grass and planted with shrubs. 4. The softball diamond infield has been regraded and grassed. 12650 - 82nd Avenue, Surrey, British Columbia, Cunada V3W 3G1_ Telephone (604) 594-7511