FE, ET Sera memantine The applicants have submittad an overall plan for development of this property outlining how it can be phased and showing alternative building massing plans within the phasing scheme. The plan calls for a linear building along ths south property line screening residential properties to the south from commercial traffic, much like Pots Place Mall. Within the site, it is proposed to have a series of smaller freestanding buildings to accommodate other uses. The alternative massing plan is to locate a large grocery chain on the property as part of the long linear saction at the south end having a bulb in the long building. Conditions for ‘approval recommended for this proposal are; firstly, that the developer ensure architectual compatibility of the various phases. While this requirement-is not as important as it once was with a multiple ownership it is feift that it should continue to be imposed in the event that multiple ownership occurs again and to require the tenants desiring to build their own structure to follow the overal| design theme, , The second condition being recommended for this proposa! is that existing interim use of the property be discontinued before granting final approval to this rezoning bylaw. That requirement is being recommended to avoid what could otherwise ‘be a conflict between noncompatible commercial uses. In conclusion, approval of this rezoning application is being recommended. The application is considered to be the first stage of a multiphase development of the Beaver Lumber property. Concerns addressed about this apolication are architectual compatibility of subsequent phases, which is to be controlled by way of a restrictive covenant or development permit. The second element of concern Is Transition. between the current interim uses and the final development of this property, which is to dealt with be termination of the interim use before commencement of development of phase one, the north west corner, Wwe. W. Brown | WB/vIj