THE CORPORATION OF THE CITY OF PORT COQUITLAM -— 2 The work that would be done by the consultant for these fees includes engineering design, preparation of contract documents, tender call and evaluation of tenders, engineering and inspection during construction, and preparation of as-built drawings and operating manuals. In addition, beth consultants have agreed to supply a set of contract drawings for the Laurier Avenue pumping station for our use at some future date, with cost to be included within the queted prices. Tt should be understood by Council that the estimated costs which are quoted by these proposals are not tendered prices. The actual costs, based on actual time spent, could be highor or lower. It should also be noted that these estimates are consid- erably higher than our own initial estimate of engineering costs which were calculated at about $23,000 or 10% of the estimated construction price. The Comnittee recommends that Associated Engineering Services Ltd, be hired to complete the engineering, tendering, field inspection, and ose-built services. LEM LE Re: Provision of Standby Power Generators Council had requested consideration of the provision Of diesel powcred emergency generators in each of the pumping stations. The estimated cost of a gencrator large enough to operate the 150 h.p. meters involved with the larger pumps would cost iu the order of $20,000 to $25,000 for each pumping station. Alternatively, a smaller ganorator suitable for operating the smaller pump in each pumping station is available from our old sewage pumping station and can be mounted on the trailer ead used asa a portable generator. The sewer utility budget already contains an amount fer the provision of this portable generator, The Committee recommends that the portable generator be provided as a standby In the event of power failure in any of the pumping stations but that we do net provide permanent auxilijary generators in each pumping station. LEM TET Re: Alarm System for Pumping Stations Couneil had also roquested the inelasien of an alarm system in the sew pumping stations. The Committee reeommends thet thin be provided in condunetion with the design of the Facilities, Estimated additional costs are not more than $2,099 or $3,000. 4 Respectfully submitted, Poe wb g arene : 4 Nee cay ee gn PY. Ane pr Tenge» City Engineer.