s on at Ron Ost) an ” ie t Oe ante Si PC Meeting July 5. 1994 Cont'd DISCUSSION: The materials to be dredged from the river will be used to pre-load the area adjacent to the Mary Hill Bypass between Kingsway Avenue and the Lougheed Highway. This pre-loaded and filled area will accommodate the re-alignment and widening of the Mary Hill Bypass, proposed by the Ministry of Transportation and Highways. As the dredging will be located off shore and the unloading of materials will occur at an existing barge unleading facility, the activities proposed in this application do not conflict with the City's existing or proposed uses in the area. The Planning Department therefore has no objections to this _application. ies iw 7 ILlgg ty -..1D690/32-33